Greenblatt Library Renovations: Peace and Quiet?

If you’ve been in the library in the past couple of weeks you’ve probably noticed no small amount of banging, sawing, drilling, and crashing. Demolition on the old restrooms in the lobby and upstairs are finally complete and some peace and quiet should be returning to your favorite study haunt.

17-10-16-14-32-38-342_deco

The journals collections on the second floor are still shifting around, however, as we prepare to take down some shelving and open up the floor for improved study spaces. Some banging may be heard as shelves are deconstructed, so please excuse our noise. Look out for the red caution tape to warn of active construction zones and if you’re looking for a journal you might just run into a librarian or two. Ask any of our faculty or staff for assistance if you’re having trouble locating any of our materials.

To view all posts about the construction use this link: https://aulibraries.com/tag/greenblatt-construction-2017-2018/